Record whether the capability exists to restore each critical function without their critical load(s). If a critical function can be restored without the critical load, record the time to initiate restoration and whether the site has documented and exercised this capability.

No critical loads present to connection with restoration plans.
BACK
Create TRN Lite Assessment
NEXT